Project Name: Phase I Project of Headquarters Base of Beibu Gulf Science Park, Nanning Economic Development Zone Region: Guangxi Progress Period: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Building Materials, Exterior Wall Decoration Materials, Door and Window Glass, Sanitary Ware , Elevators, Cranes, Cranes, Excavators, Waterproof and Anticorrosive Materials, Paint Coatings, Valve Components, Ceramic Products, Instrumentation, Water Supply and Drainage Systems, Pipe Fittings, Water Supply Equipment, Outdoor Drainage, Building Electrical, Lighting Fixtures, Low Voltage Electrical Appliances, Wire and Cable , Weak current system, Lightning system, Low voltage distribution cabinet, Steel structure. (for reference only)
Project Profile: The project is located on the south side of Guokai Avenue. The east side of the project is Hepu Road, the west side is Zhuangjin Avenue and the north side is Guokai Road. The project covers an area of ​​18,4235.3 square meters, with a total construction area of ​​717,759.82 square meters, of which the above-ground construction area is 538,575.88 square meters and the underground construction area is 179,183.94 square meters. It plans to construct a super high-rise office building, 6 high-rise office buildings, 1 five-star hotel, and 1 characteristic business hotel, and build corresponding commercial facilities. The total investment of the project is 2.2 billion yuan.
Construction Unit: Nanning Park Construction Investment Co., Ltd. Postal address: No. 413, No. 415, Development Zone Building, No. 230, Jiangnan Road, Nanning Zip Code: 530000 Contact Person: Telephone Engineer: Hangzhou Institute of Environmental Protection, Coal Research Institute (EIA)
Postal address: No.288 Gongxiu Road, Xiaoshan District, Hangzhou Zip code: 311200 Contact person: Wang Gong Telephone Fax
Project Profile: The project is located on the south side of Guokai Avenue. The east side of the project is Hepu Road, the west side is Zhuangjin Avenue and the north side is Guokai Road. The project covers an area of ​​18,4235.3 square meters, with a total construction area of ​​717,759.82 square meters, of which the above-ground construction area is 538,575.88 square meters and the underground construction area is 179,183.94 square meters. It plans to construct a super high-rise office building, 6 high-rise office buildings, 1 five-star hotel, and 1 characteristic business hotel, and build corresponding commercial facilities. The total investment of the project is 2.2 billion yuan.
Construction Unit: Nanning Park Construction Investment Co., Ltd. Postal address: No. 413, No. 415, Development Zone Building, No. 230, Jiangnan Road, Nanning Zip Code: 530000 Contact Person: Telephone Engineer: Hangzhou Institute of Environmental Protection, Coal Research Institute (EIA)
Postal address: No.288 Gongxiu Road, Xiaoshan District, Hangzhou Zip code: 311200 Contact person: Wang Gong Telephone Fax
Related Developments: Tower Crane Infrastructure Project
Powerful Handheld Blender,Mini Kitchen Blender,Electric Stick Blender,Electric Hand Blender,Portable Baby Food Mixer,Electric Fruit Mixer,Fruit Blender,Plastic Egg Blender
NINGBO CHENGTUO ELECTRIC APPLIANCE CO.,LTD , https://www.chengtuoappliance.com