| Technical performance |
Â
Mode | DYB-40 | DYB-60 | DYB-80 |
---|---|---|---|
Flow rate | 20-40L/min | 20-60L/min | 20-80L/min |
Max. Pressure | 3Bar | 3Bar | 3Bar |
Power | DC24V DC12V | AC220V±10% 50Hz | AC110V±10%50Hz |
Bypass Valve | Yes | Yes | Yes |
Strainer | No | Yes | Yes |
Â
WHY BLUE SKY?
1. Blue Sky used to be the first factory special for dispenser controller in China. With over 20 years' history in this field and continuous optimization & innovation, Blue Sky makes controllers with as many functions as you like.
2. Almost every part is made by Blue Sky itself, including controller, flowmeter and pump, since Blue Sky finds that other factories' products cannot meet its demands and requirements due to the increasingly thriving business all over the world.
3. Professional, steady and advanced as Blue Sky is, its products already passed ATEX, OIML and other standards.
4. With top-ranking staff, some of which are from the first dispenser factory in China, and some belong to the new generation, Blue Sky dispensers boast sound market reputation, extensive business channels, solid customer foundation and strong market competitiveness.
5. Persisting to the principle of "making trade services the forerunner of the business", Blue Sky will strive for high efficiency, passion, integrity to provide customers with superior trade services.
Presentation of Blue Sky factory
The take-up machine,SG800 take-up machine adopts shaft-less type pneumatic to top,winding displacement use dia 50 polish rod strand oscillator,spool size by customer,step-less speed regulation.we can make the trunk take up machine,spool take up machine,the each motor is 11KW,
The first Safety precautions for LZ600 wire drawing machine+take up machine
1. 1 Professional and technical personnel are required to carry out installation and commissioning. Before use, it is necessary to carefully read this manual and the relevant electrical instructions provided.
1. 2 Each machine and electric control cabinet shall be reliably grounded with a grounding resistance not more than 4Ω.
1. 3 There should be no accumulated water on the table top, especially near the operation box, as it can easily lead to circuit failure due to water infiltration.
The second Delivery inspection
2. 1. Check whether the equipment is damaged and complete upon delivery (according to the packing list). If there is any damage or inconsistency with the contract, please contact the dealer or manufacturer immediately.
2. 2 The manufacturer is only responsible for quality issues arising during production, and is not responsible for damage caused during unpacking, improper installation and use, or damage caused by overload operation.
2. 3 After unpacking, the accompanying documents should be properly kept, as they are necessary during equipment installation, commissioning, and use.mc
The third technical indicators
We can make take up machine,wire drawing machine,layer winding machine,drum packing machine,flux cored forming machine
inding machine,drum packing machine,flux cored forming machinespooling machine,winding up machine,steel wire take-up machine
Jiangyin Wanyi Machinery CO.,Ltd , https://www.wydrawmachine.com